Home | Search Negril | Negril Map | Videos | Forum | Negril Calendar of Events | Where To Stay | Transportation | Restaurants | Things To Do

Results 1 to 10 of 12

Thread: Movin' on up.....

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Member

    User Info Menu

    Movin' on up.....

    Ailsa apartment is done including the AC. Time for me to go back up on Zion Hill. This is the new house spot.

    The old round house was 30 ft above this but we don't manage the climb as when we were young. The first picture is taken from the bottom of the steps to the round house.

    I can drive to this house. We expect to start building this month. Water and electric are there. (remember the wata project?)

    Name:  3Post.jpg
Views: 819
Size:  99.0 KB

    Name:  Over look.jpg
Views: 810
Size:  87.6 KB

    Name:  Best Spot Pic.jpg
Views: 768
Size:  99.7 KB
    Last edited by captaind & Linston; 11-24-2015 at 06:31 PM.

    linston@redplate-negril.com

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •