Home | Search Negril | Negril Map | Videos | Forum | Negril Calendar of Events | Where To Stay | Transportation | Restaurants | Things To Do

Page 2 of 2 FirstFirst 12
Results 11 to 17 of 17

Thread: Zion Hill progress as of 9/13/13

  1. #11
    Member

    User Info Menu

    Re: Zion Hill progress as of 9/13/13

    Good Works! I spy that lovely rich looking soil that the pipe trench is dug into. gonna be some nice veggies grown on Zion Hill!

  2. #12
    Member

    User Info Menu

    Re: Zion Hill progress as of 9/13/13

    The wiring went into the workshop (chicken coop) today.

    Excellent job. I will recommend this guy. Done to code as I would expect here in the States.

    Pump test worked. Feed to the roof top tank and up to Zion Hill (75 foot lift) works great

    Ordered six 650 Gal tanks from RotoTech today.

    Meanwhile Courtney and his posse cut a shi*T load of fence posts today.

    Damn I wish I was there.
    Linston's Zion Hill Taxi

    Captain Dave

  3. #13
    Member

    User Info Menu

    Re: Zion Hill progress as of 9/13/13

    Quote Originally Posted by captaind View Post
    Damn I wish I was there.
    Me too

  4. #14
    Member

    User Info Menu

    Re: Zion Hill progress as of 9/13/13

    If you got wata, you're good to go - full speed ahead. and yeah, I wish I was there too! I am an excellent farm hand if you need more, I grew up working on a horse farm busting bales of hay and 100 pound bags of feed, and pushing countless wheelbarrow loads to the manure pile, LOL! I worked so I could ride horses in exchange.

  5. #15
    Member

    User Info Menu

    Re: Zion Hill progress as of 9/13/13

    Lookin great Cap., I know your getting pumped ! (grin)

  6. #16
    Member

    User Info Menu

    Re: Zion Hill progress as of 9/13/13

    Everything works!!!!!!

    We've got full pressure over the hill and up to the roof tank. I can deliver water to anywhere on the property now!

    The back fence is coming along. All the posts are cut and we start with the wire on Monday.

    Everybody's paid and I have pictures of the work...Life's good

    BTW...If you're wondering ....this week's payroll was 900 US...about the price of two nights at a AI
    Linston's Zion Hill Taxi

    Captain Dave

  7. #17
    Member

    User Info Menu

    Re: Zion Hill progress as of 9/13/13

    You got a lot of bang for you bucks!!! I'm sure it is a dream come true. So blessed to be able to see this all come together and still be healthy and strong. Life is to be lived and you are doing that fi sure!!! Congrats to all involved!!!
    [url=http://www.TickerFactory.com/]

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •