    Have they come to a consensus on this project yet?

    http://www.jamaicaobserver.com/weste...ENDED_15224030
    Peace, Todd & Cher

  2. #2
    Administrator

    User Info Menu

    Re: Negril sidwalk

    Apparently the suspension ended just a few days after that October 11th article was written. Worked stopped for about 5 days, and has since started back up with more sidewalk being constructed.

    This all happened well before the Heroes Day holiday on October 21st....
    Negril.com - For the vacation that never ends!

  3. #3
    Member

    User Info Menu

    Re: Negril sidwalk

    So how far are they now Rob?

  4. #4
    Administrator

    User Info Menu

    Re: Negril sidwalk

    I will check today.... heading up the beach road later...
    Negril.com - For the vacation that never ends!

  5. #5
    Member

    User Info Menu

    Re: Negril sidwalk

    Thanks Rob

  6. #6
    Member

    User Info Menu

    Re: Negril sidwalk

    Quote Originally Posted by Rob View Post
    Apparently the suspension ended just a few days after that October 11th article was written. Worked stopped for about 5 days, and has since started back up with more sidewalk being constructed.

    This all happened well before the Heroes Day holiday on October 21st....
    Great! Thanks.
    Peace, Todd & Cher

  7. #7
    Member

    User Info Menu

    Re: Negril sidwalk

    Hey Rob did you check out the sidewalks yesterday?

  8. #8
    Administrator

    User Info Menu

    Re: Negril sidwalk

    They are finishing the entire stretch up to the Grand Pineapple - the few areas that were yet to be completed (in front of Yoga Center and Time Square) are being finished and two areas are being re-done (jack hammered) to replace or repair something - I couldnt tell which.

    Interestingly, they are adding curbs at each of the driveway entrances, and when the driveways are close enough together, those areas in between the driveways are being turned into small garden areas. I guess this is part of the beautification of the sidewalk that had been discussed.

    Other small changes have been made, but nothing majorly significant to the eye as of yet...
    Negril.com - For the vacation that never ends!

  9. #9
    Member

    User Info Menu

    Re: Negril sidwalk

    Thanks for the update Rob

  10. #10
    Member

    User Info Menu

    Re: Negril sidwalk

    Quote Originally Posted by Rob View Post
    They are finishing the entire stretch up to the Grand Pineapple - the few areas that were yet to be completed (in front of Yoga Center and Time Square) are being finished and two areas are being re-done (jack hammered) to replace or repair something - I couldnt tell which.

    Interestingly, they are adding curbs at each of the driveway entrances, and when the driveways are close enough together, those areas in between the driveways are being turned into small garden areas. I guess this is part of the beautification of the sidewalk that had been discussed.

    Other small changes have been made, but nothing majorly significant to the eye as of yet...
    Thanks for checking Rob. I was hoping they would be completed up to at least CoCo so I could walk with my mother on the sidewalk rather than the beach. Oh well, we will make it one way or another